12-17-2008, 07:59 AM
You got the SPI right? I got tools and I've only changed the timing belt on a Zetec. Lower ball Joints require to be cut out by a torch. I've tried drilling out the rivets before but I ended up using a torch I borrowed from my boss. The thermostat is pretty easy to do. As for the wheel bearings I think you need a press.