03-19-2009, 09:20 AM
In my experience, the prep was the most important part of the process with the epoxy for it to work well. When I did my sister and bro in law's floor, I told them to clean it real good, use a degreaser and even gave them a light acid solution for etching the concrete. They said they prepped it but they didn't. Just hosed it off with water and left it to dry. I was pissed they didn't do it proper and since they were paying me to do it because they can't figure out how to use a roller on a floor I did it anyway. It lasted about 6 months and started to peel. When I did my parents and degreased it and etched it, hmm, 3 years, no peeling.
I don't know how much prep you did for yours, but I suggest that. I believe you can get a good rubberized floor coating that rolls on and is similar to the Rhino lininig or Line X but thinner and a little smoother.
I don't know how much prep you did for yours, but I suggest that. I believe you can get a good rubberized floor coating that rolls on and is similar to the Rhino lininig or Line X but thinner and a little smoother.
No name, Cheap and Slutty.
MMM Daddy Like
MMM Daddy Like