01-19-2010, 01:29 AM
Hey guys - I'm going to get started on finishing my last major reno on the house. And that is to put a 3rd washroom in the basement.
The floor is going to be slate tile, a section of it is going to be heated (30 sq/ft)
What i was wondering is if I should be putting some sort of sub flooring down ontop of the concrete before appling my heated mats, thinset, mud and tile...
From what I've read, some say to put subflooring to ensure the floor is level, and others say you can level out anything with the thinset/mud anyways.
What have you guys done in the pass?
The floor is going to be slate tile, a section of it is going to be heated (30 sq/ft)
What i was wondering is if I should be putting some sort of sub flooring down ontop of the concrete before appling my heated mats, thinset, mud and tile...
From what I've read, some say to put subflooring to ensure the floor is level, and others say you can level out anything with the thinset/mud anyways.
What have you guys done in the pass?