03-15-2005, 04:04 AM
BerinG,Mar 14 2005, 01:54 PM Wrote:so everything's pretty much done besides installing.. do you already have your bov or bypass.. iat.. the bung to mount them on your piping?
[right][snapback]93466[/snapback][/right]
No the piping still needs to be cut, fitted and welded. Jay will do all that fun stuff. The header is a stage 2 so it still needs the turbo flange welded on, but it is done and ready. Yes I have the bypass as well as the O2 housing for the 14B. As for the IAT, not sure what we'll do, Im sure Jay will figure something out.
The only things I can see myslef missing is all the nuts and bolts for the turbo and all the misc flanges. Im sure we can pick those up on Sat or something...Im suremore s**t will come up as we start, but Im prepped for it. ;)