Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Camshaft Install
#2
-lift valve cover
-lossen timing belt tensionner with halen key and key.
-slip timing belt off the gear.
-remove the old cams.
-remove passenger wheel to access crank bolt. (crank pulley)
-check for tdc with either a long stick, or with the udp check mark downward at 6oclock.
-instal the gear on the new cams.
-lub new cams
-put new cams in with proper torque... (i think its 18 nm) double check.
-use cam tools or make a metal plate that fit in the cam slots to line them both up. (I have been found using the most unortodox crap for that myself...)
-put the belt back on.
-retension the belt.
-put valve cover back on.
-start and enjoy.


I think it sum it all up. double check for the torque of the "cams bridges"?

-marc
------------------------------------------------
-1991 Nissan Pulsar GTI-R
-2002 Red SVT focus # 2262 - sold
-2000 silver ZX3 - sold
Reply


Messages In This Thread
Camshaft Install - Paparoach - 04-29-2004, 01:11 AM
Camshaft Install - french_connection - 04-29-2004, 02:29 AM
Camshaft Install - french_connection - 04-29-2004, 02:31 AM
Camshaft Install - Paparoach - 04-29-2004, 02:59 AM
Camshaft Install - 2001 ZTS - 04-29-2004, 03:16 AM
Camshaft Install - Oldfocus - 04-29-2004, 05:37 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)